References: Environmental planning
 
2010-2012 Brandenburg, Germany Review of the breeding bird populations of the Welzow airfield and ecological supervision of construction work within the Natura 2000 site "Weißer Berg"
 
Client: juwi Solar GmbH
2011 Saxony, Germany Development of a general operating plan for the Buchholz clay surface mine including the EIS for the regional planning and plan approval procedures, a technical paper for legal protection of species, a SPA-compatibility assessment and the processing of the impact regulation (balance).
 
Client: Oberlausitzer Tonbergbau GmbH, Vierkirchen.
2011 Namibia Groundwater specialist input to the Stage 3 Environmental Management Plan (EMP) and the Stage 4 Environmental Impact Assessment (EIA) for the Langer Heinrich Uranium Mine, Namibia (Paladin Energy). Modification of the existing finite differences numerical groundwater flow model and set up of a finite element based flow solution. Simulation of proposed in-pit tailings backfill and hydraulic relevant faults and fractures.
 
Client: SLR Environmental Consulting (Namibia)
LHM_stage4_EIA.jpg
2010-2011 Brandenburg, Germany Creation of nature conservation documents for the planned expansion of wind farms Spremberg (EIS, LCP, SPP)
 
Client: e.n.o. energy GmbH, Dresden.
2003-2011 Saxony, Brandenburg, Germany Nature conservation guidance in the application procedure according to BImSchV for several wind-power-locations. EIA, Habitats / SPA studies. Several projects, e.g. Elsterheide
 
Client: Boreas Energie GmbH
 
 Page: Item: 6 - 10 Total: 15