Review of the breeding bird populations of the Welzow airfield and ecological supervision of construction work within the Natura 2000 site "Weißer Berg" Client: juwi Solar GmbH
2011
Saxony, Germany
Development of a general operating plan for the Buchholz clay surface mine including the EIS for the regional planning and plan approval procedures, a technical paper for legal protection of species, a SPA-compatibility assessment and the processing of the impact regulation (balance).
Groundwater specialist input to the Stage 3 Environmental Management Plan (EMP) and the Stage 4 Environmental Impact Assessment (EIA) for the Langer Heinrich Uranium Mine, Namibia (Paladin Energy). Modification of the existing finite differences numerical groundwater flow model and set up of a finite element based flow solution. Simulation of proposed in-pit tailings backfill and hydraulic relevant faults and fractures.
Nature conservation guidance in the application procedure according to BImSchV for several wind-power-locations. EIA, Habitats / SPA studies. Several projects, e.g.Elsterheide