References: Hydrogeology |
|
2011-2012 |
Saxony-Anhalt/ Germany |
Ecological Project Buna - Planning, Monitoring and Analysis of pumping test to validate impacts of specific frame conditions: three pumping tests for 72 hours with 20 monitoring bore holes.
Client: DOW Olefinverbund GmbH, DOW Schkopau |
|
2011 |
Namibia |
Groundwater specialist input to the Stage 3 Environmental Management Plan (EMP) and the Stage 4 Environmental Impact Assessment (EIA) for the Langer Heinrich Uranium Mine, Namibia (Paladin Energy). Modification of the existing finite differences numerical groundwater flow model and set up of a finite element based flow solution. Simulation of proposed in-pit tailings backfill and hydraulic relevant faults and fractures.
Client: SLR Environmental Consulting (Namibia) |
|
2011 |
Namibia |
Development of a hydrogeological concept model, a numerical groundwater flow model and a solute transport model as part of the Environmental Impact Assessment (EIA) for the mining application of the proposed Omitiomire Copper Oxide Mine, Namibia (Craton Mining and Exploration (Pty) Ltd).
Client: SLR Environmental Consulting (Namibia) |
|
2009 |
Saxony, Germany |
Research on economic issues of the European Water Framework Directive (WFD). Implementation of Article 9 WFD in Saxony - consideration of environmental and resource costs.
Client: Sächsisches Landesamt für Umwelt, Landwirtschaft und Geologie |
|